Nikkiso customer testimonials

Petronet LNG Limited: Chief Manager Maintenance

Since the start-up of our plant in April 2004, all of our high-pressure pumps by Nikkiso Cryo have been dismantled during scheduled overhaul and no abnormality was found. The longest accumulated operation hours of LNG HP pump is 20,289 hours.


Abu Dhabi Polymers Company Ltd.: Mechanical Engineer(Borouge)

At Borouge, Ruwais (Abu Dhabi), we have had Nikkiso Cryo pumps in operation for Ethylene Transfer since 2001. Running hours have ranged from 24,000 to 43,000. These pumps are in service without any overhauling maintenance since commissioning.


Gastech: Maintenance Manager

For one of our sites, we commissioned many submerged motor pumps manufactured by Nikkiso Cryo,
and they were installed in vertical columns of newly constructed LPG (propane and butane) storage tanks. During the last 10 years, the performance of these pumps has been found to be maintenance / trouble-free. The product loading / circulation activities are being carried out safely and within operating envelops.


   

 

   

 

 

 